2. Februar 2022 | Success Story, Raffinerie, Prozessgas-Kompressor, Europa
Compressor optimization meets new process requirements
A leading European oil and gas company, focused on exploration and production in the Mediterranean, needed to modify the capacity of a compressor to meet new process specifications requiring a more than 50% reduction in gas flow. The customer contacted Burckhardt Compression to revamp and overhaul the compressor to efficiently meet the new operating parameters. A detailed inspection and engineering study were required to identify the optimal approach to modification and revamp.
Challenges:
- Lowering the flow rate from 5’000 Nm3/h down to approximately 2’000 Nm3/h to meet new process requirements
- Ensuring minimal disruption to the facility and its operations
- Identifying the optimal approach for modifying the existing compressor
- Working within the constraints of the original compressor design
- Challenging gas composition
Type | Process Gas Compressor 2B2S 1.51 | Gas | H₂S + Hydrocarbon mix |
Power | 380 kW / 510 hp | Suction pressure Discharge pressure |
3.1 bara / 45 psia 11 bara / 160 psia |
Speed | 490 rpm | Lubrication | Lubricated |
Burckhardt Compression Solution:
- Detailed inspection and engineering study
- Delivery of new cylinders with smaller diameters, achieving the new flow rate
- All internal cylinder parts manufactured in-house according to API standards
- Complete overhaul of the compressor carried out at a Burckhardt Compression Service Center, incl. repair of the crank case, distance piece and crankshaft
Watch here the time-lapse video of the overhaul - Mechanical bar-over test
Customer Benefits:
- Energy savings of approx. 1’800 MWh per year by adapting the compressor to the lower flow requirements and therefore avoiding the bypass system
- Clear definition of the necessary modifications within the engineering study
- As good as a new compressor, all parts upgraded to high performance components
- New cylinders implemented without requiring any modifications to the existing foundation, gas and cooling water piping nor the electrical motor
- Single service partner: from consulting to project execution
- No safety incidents
Watch the story: