Skip to content
Bird-view perspective of Hyper Compressor being assembled at BCAG workshop

Reduced maintenance costs thanks to swift diagnosis and precise repairs

February 10, 2025

During a recent visit by a Burckhardt Compression field service expert, significant fretting marks were discovered on the distance piece and small end pin. This issue led to unscheduled shutdowns, increased wear, and excessive vibration, resulting in high maintenance costs for PTT. As specialists in parts repair and refurbishment, Burckhardt Compression identified
the root cause and implemented a sustainable solution to enhance reliability. This implementation highlights our dedication to sustainability across all our services and products, emphasizing the longterm environmental and operational benefits.

We were amazed by the level of performance achieved! Burckhardt Compression quickly identified the problem and carried out the repairs with great precision. Given the outstanding results of this project, we plan to involve Burckhardt Compression in many more overhaul projects at other facilities.

PTT Global Chemical Public Company Limited

Customer challenges

  • Need for maximum compressor uptime
  • Tight budget for parts and repair
  • Tight schedule for job execution
  • Avoiding waste, as many parts as possible should be re-used

Technical data

Manufacturer Burckhardt Compression
Type Hyper compressor K10
Power 22’500 kW / 30’160 hp
Speed 200 rpm
Gas C2H4
Suction pressure 240 bar / 3’480 psi
Discharge pressure 2’700 bar / 39’160 psi
Lubrication Yes

 


Our solution

In-house machining
Burckhardt Compression Thailand machined the parts in their workshop to avoid lengthy and costly transportation.

Precision and quality
All repair work was done within given, stringent tolerances adhering to the highest quality standards.

On time
By working in day and night shifts, the execution of the project could be expedited to stay within the tight time frame.

Preparation is key
All work was planned for execution in Burckhardt’s primary  workshop,  but a backup workshop was in place in case any additional workforce was needed.

Communication and coordination
Open lines between the on-site team, the workshop team and the customer for most effective communication and project coordination.


Customer benefits

  • Bad actors were eliminated and refurbished parts delivered
  • Substantial increase in lifetime of parts to minimum two years
  • Significant reduction in maintenance costs of approx. 60%
  • Sustainability improved – reduced waste and reduced carbon footprint by re-using parts