MOL Petrochemicals LDPE plant

Doubled lifetime of high-pressure components after modernization of other brand hyper compressor

July 6, 2021

The project scope included the high-pressure packing, plungers and central valves for second-stage cylinders to be installed all under the supervision of a highly qualified Field Service Representatives team.

Burckhardt Compression really provided a comprehensive solution of great value to us. After they assessed our hyper compressor we received a detailed report with replacement and upgrade recommendations. Since the compressor modernization, our system availability has increased significantly.

MOL Petrochemicals

Customer challenges

  • Frequent unscheduled plant shutdowns caused by failing components
  • Hyper compressor operating under very challenging conditions
  • Condition assessment needed for 30-year-old hyper compressor
  • Very short lifetime of the high-pressure (HP) packing and other hyper compressor key components
  • High leakage

Technical data

Manufacturer Non-Burckhardt
Type 6PK/2
Power 6 MW / 8’046 hp
Speed 214 rpm
Gas Ethylene
Suction pressure 250 bara / 3’600 psia
Discharge pressure 2’800 bara / 40’600 psia
Lubrication Forced lubrication to cylinder

Our solution

  • On-site condition assessment incl. high-pressure components to define scope
  • Retrofit of HP packing according to the latest Burckhardt Compression design
  • Reverse engineering of valve unit and plunger, incorporating Burckhardt Compression’s latest manufacturing expertise
  • Dedicated team of highly qualified Field Service Representatives and technical support on site
  • Verification of third-party lubrication pump unit in order to ensure the oil supply
  • Training of customer’s maintenance team in the modern facility in Switzerland
  • Experience and knowledge exchange about the LDPE process and lubrication challenges

Customer benefits

  • System availability and components lifetime increased more than 100%
  • Over 50% reduction in maintenance and operating costs
  • Significantly reduced leakage
  • Increased safety level of MOL’s trained maintenance team
  • Detailed assessment report
  • Nearby Service Center for fast HP component refurbishments and support