Dry-dock com­pres­sor ser­vice com­ple­ted wi­t­hin 18 days

February 17, 2022

The vessel is equipped with two Burckhardt Compression Laby®-GI BOG compressors, which allow the vessel to reuse 1’600 tons of natural gas every year that would otherwise be wasted. This contributes to reduced sulfur and CO2 levels for the operator.

Burckhardt Compression reacted swiftly on the location change and thanks to their global setup, they could mobilize manpower fast. The project organization and communication was second to none and we are very confident to continue working with Burckhardt Compression during upcoming dry-dock projects. Speed, expertise and flexibility, this is what we expect from our partners.

What our customer says

Customer challenges

  • Re-arranging staff and materials for new location
  • Daytime temperatures between 38°C and 42°C with 60% humidity
  • Handling additional requirements outside the original project scope
  • Limited time to source additional parts and install them

Technical Data

Manufacturer Burckhardt Compression
Type 2 x 6LP 190- 5A_1
Power 1250 kW / 1676 hp
Speed 714 rpm
Gas BOG
Suction pressure 1.02 bar(a) /14.97 psi (a)
Discharge pressure 314 bar(a) / 4553 psi (a)
Lubrication Lubricated 4thand 5th stages

Our solution

  • Burckhardt Compression’s streamlined process for parts procurement is tailored to short dry-dock interventions
  • The local Service Center in Dubai supported the onboard service team
  • Direct access to the manufacturing plant in Winterthur sourced any additional parts quickly
  • Engineering and troubleshooting assistance available 24/7
  • Burckhardt Compression coordinated other teams to complete work on equipment such as the gas coolers

Customer benefits

  • The Burckhardt Compression team worked autonomously, reducing pressure on the customer’s dry-dock management team
  • OEM expertise and factory support for the project provide peace of mind
  • OEM knowledge and facilities minimize project timeframe
  • Successful completion of the service within 18-day dry-dock window
  • Optimized compressor performance until the next service in 2.5 years