Reviving high-pressure air compressors – a sustainable turnaround

Reviving high-pressure air compressors – a sustainable turnaround

June 25, 2025

Originally installed onboard a ship, the compressors were decommissioned based on the customer’s lifecycle estimation guidelines. The customer initially requested an inspection and certification for disposal. However, during our visual assessment, we found that while some components were irreparably damaged due to the harsh marine environment, the core integrity of the compressors remained intact.

Following technical discussions, the customer agreed to our proposal to restore the units. This collaborative decision led to the successful revival of the compressors, showcasing the value of sustainable refurbishment over replacement. 

We were impressed by the transformation of what was once considered non-operational into fully functional, high-performing compressors. The Factory Acceptance Test at 400 barg exceeded our expectations, and the professionalism of the Burckhardt Compression India team was commendable.

Customer Representative, Material Organisation, Visakhapatnam
 

Customer challenges

  • Inoperative panels and motors
  • Missing critical components
  • Outdated and corroded systems
  • Urgent requirement to make a ship operational
     

ManufacturerBurckhardt Compression India
TypeSHP - S5W217L
Power80 kW /  107 hp
Speed1'480 rpm
GasAir
Suction pressure1’013 bara / 14’680 psia
Discharge pressure401 bara /  5’800 psia
LubricationForced-feed type

Our solution

Thorough project planning
Our teams meticulously inspected the equipment and created a project plan that responded to every need and stayed within the given timeline.

Comprehensive service scope
In order to bring the compressor systems back into an operational status, they needed a complete revamp. We offered a full service scope that covered all needed repair and refurbishment actions.

Re-using parts
Not all parts had to be disposed of. We examined thoroughly which parts could be salvaged and repaired them to reduce the environmental impact.

New parts, where necessary
Despite all efforts, some components needed replacing including components for motors and panels.

Full working condition restored
Finally, we assembled the compressors and systems, conducted a full-load test at 400 barg to validate all operational parameters, and the customer witnessed a Factory Acceptance Test.

Working day and night
With a very tight schedule, we could complete the project on time by working in 24 hours in shifts. 


Customer benefits

  • Compressor systems fully restored
  • Significant cost savings over buying new compressor packages
  • Extended asset lifespan
  • Reduced environmental impact
  • Quick turnaround
  • Burckhardt Compression as trusted partner with technical capabilities and a sustainable approach
     